Modern Distribution · Operations Manager

From 8,000 a Day With 8–10 People
to 40,000 With Four Operators

How Modern Distribution replaced a labor-heavy knockbox workflow, cleared its production backlog and built a three-machine FlexPak operation with capacity for nearly 50,000 pre-rolls in a day.

"Stock on the shelf. We were finally getting ahead of orders."Markie Davis · Operations Manager, Modern Distribution
40,000Expected daily output with two FlexPak machines
≈47,000Client-reported record day
2 PEOPLECore crew per machine at full-speed production
1 WEEKReported equipment payback on the first major order

Demand wasn't the problem. Getting enough finished pre-rolls on the shelf was.

Modern Distribution had customers ready to buy. What it did not have was a production system capable of keeping up.

The company's budget knockboxes could produce acceptable pre-rolls—but only after employees manually packed every cone with a pen. A full day with an eight- to ten-person crew topped out at approximately 8,000 units.

After implementing its first FlexPak, a two-person team began at approximately 10,000 pre-rolls per day. Within one to two weeks, after calibrating its material preparation and weight settings, the same machine reached approximately 20,000 per day. Modern ultimately expanded to three FlexPak machines. Running two systems with four core operators established a dependable 40,000-unit daily baseline, with the company's best days approaching 47,000.

The production-floor difference.

North Carolina high-volume hemp operator · before versus FlexPak
Manual capping controlled the entire day8,000 MAX

Pre-rolls produced per full day · eight to ten employees across the line · budget 100-count and 340-count knockboxes · every pre-roll manually packed and capped with a pen · high demand created a growing order backlog · limited inventory made it difficult to promise larger orders · adding labor did not solve the underlying throughput ceiling

With one FlexPak≈20,000

Pre-rolls produced per day after calibration · two-person core machine crew · ~10,000 per day during the initial one- to two-week ramp · entire rows packed and closed within the FlexPak workflow · reported weight margin held to ~0.04 g · enough capacity to build inventory and sell ahead of demand · roughly tripled the company's pre-roll business

40,000Expected daily output (two machines)
≈47,000Client-reported record day
0.04 gReported weight margin
3 machinesFlexPak fleet built over time
With one machine, it's a two-person group. We started around 10,000, and once we got to full speed, 20,000 was easy.
Markie Davis

Simple enough to scan. Specific enough to believe.

01
The knockbox worked. The labor model didn't.

Modern Distribution began with imported budget knockboxes, moving from 100-count units to larger 340-count systems as demand increased. The machines could vibrate material into the cones, and the finished quality was acceptable. The bottleneck came next. Every cone still had to be removed and manually packed with a pen to reach the desired density. Employees then had to close, inspect and move the product into packaging. Even with eight to ten people working a full day, production maxed out at approximately 8,000 pre-rolls.

02
The first machine put product back on the shelf.

The jump from a roughly $2,000 knockbox to a FlexPak package costing approximately $15,000 at the time created understandable hesitation. But Modern was already 'drowning' in demand it could not fulfill. The first FlexPak was simple enough for the team to begin producing on its first day. It took approximately one to two weeks to standardize the grind, calibrate the weight range and reach full speed. Initial output reached about 10,000 per day. Once calibrated, the two-person team reached approximately 20,000. That capacity changed the sales conversation—Modern could keep inventory on the shelf, get ahead of existing orders and confidently accept larger opportunities.

03
A proven process made the next machine an easy decision.

As demand continued to grow, Modern reached another capacity decision. The company could invest in a much larger, more complicated system—or add another machine its team already understood. Modern chose the repeatable path. Two machines with four operators established a reliable 40,000-unit daily workflow. A third FlexPak gave the facility additional surge capacity while preserving the same training, tooling and operating process.

We could finally stock up for the future. That roughly tripled our pre-roll business just like that.
Markie Davis

The machine increased capacity. The process created consistency.

Modern's team was able to operate the FlexPak on day one. Reaching full production speed required something more important than simply turning on the equipment: standardizing everything that reached the machine.

Markie identified two priorities: source material with consistent density and characteristics, and build a repeatable grinding process around that material. Because FlexPak fills volumetrically, inconsistent material preparation produces inconsistent weights. Modern used its initial one- to two-week ramp to tighten those upstream procedures and calibrate the machine for each operator.

Once those steps were established, the team reported holding an approximately 0.04 g weight margin while producing as many as 20,000 pre-rolls per machine per day.

Our margin was 0.04 of a gram—super small—and we were still pushing out 20,000.
Markie Davis

More output with fewer people tied to the machine.

The old workflow required eight to ten people to reach a maximum of 8,000 pre-rolls during a full production day. At full speed, one FlexPak allowed two core operators to produce approximately 20,000. On a simple units-per-assigned-worker basis, that moved production from roughly 800–1,000 units per worker to approximately 10,000.

The larger business effect mattered just as much as the labor savings. Modern did not have to eliminate the remaining team. It could redirect those employees to gummies, vapes, beverages, flower and other revenue-producing SKUs while the pre-roll line continued producing at a higher level.

Two people were on the machine. The other six people were doing other things that make us money.
Markie Davis

Scale without rebuilding the production floor.

Modern's first FlexPak proved the workflow at 20,000 pre-rolls per day. The second doubled the dependable production baseline. With two machines and four core operators, Modern expected approximately 40,000 pre-rolls in a production day. Its strongest recorded days came within roughly 3,000 units of 50,000.

The company later added a third system, giving the operation the flexibility to run one, two or three machines based on current demand. That modular capacity allowed Modern to scale output without forcing every order through one expensive single point of production.

Forty thousand is expected. Getting close to 50,000—that's our record.
Markie Davis

Once packing got faster, manual cone loading became the slow step.

After Modern increased machine output, loading empty cones into each plate became the next obvious bottleneck. As an early operating partner for the FlexPak Auto Cone Loader, Modern began stacking cones into a master plate that holds multiple layers. Loading the tower took approximately three minutes. Once prepared, the loader could release a layer of cones into the production plate in roughly 20 seconds.

Markie estimated that the stacked system reduced repetitive manual plate-loading steps by approximately eight times. In Modern's two-machine configuration, it also allowed the core crew to move from four people to three: one employee could run the loader and help close while the other operators kept production moving. At the time of the interview, Modern had only been using the loader for two to three months and had not yet run enough sustained peak demand to establish a verified full-day output increase.

Once the master plate is loaded, it takes about 20 seconds. Drop it in, lower the plate, raise it back up and you're ready to go.
Markie Davis

Same-day answers. Parts moving that night.

Modern has needed replacement components and additional parts during its time with FlexPak. Markie described the support process as straightforward and consistently responsive. When the team reached out, it typically received an answer the same day. Required components were shipped that night and commonly arrived the following day or the day after.

Markie also highlighted small actions that reduced future interruption—such as including extra setup-box rails without waiting for the customer to request them.

The support has been top-notch. We reach out, and the same day it's, 'I'll send it tonight.' You have it tomorrow or the next day.
Markie Davis

The price jump felt large—until the first order ran.

Modern initially compared an approximately $15,000 historical FlexPak package with the roughly $2,000 knockboxes it had already been using. Looking only at the equipment price made the difference feel substantial. Looking at finished output and labor changed the calculation.

Markie reported that the machine recovered its cost during the first significant sales order—approximately one week of operation for Modern's product mix and margins. That return made the second and third machines easier to justify. Modern was adding proven capacity rather than starting another equipment experiment.

For the price point versus the output, you'll make your money back in a week. We made ours back within the first sales order.
Markie Davis

The answers buyers actually want before changing equipment.

01What was holding production back before FlexPak?+
The knockboxes filled the cones, but then we had to manually pack every single pre-roll with a pen. With eight to ten people working the whole day, 8,000 was our maximum.
02How quickly did the team begin producing?+
We were running the machine on the first day. It took one to two weeks to dial in the weight ranges and get every operator to full speed. We started around 10,000 per day, and then we reached 20,000.
03What did the added capacity change for the business?+
We finally had stock on the shelf and could get ahead of orders. Instead of telling customers we could only promise a limited quantity, we had product ready to sell. It roughly tripled our pre-roll business.
04How did you maintain tight weights at higher volume?+
Start with a consistent farm and build a consistent grinding process. If the grind changes, the weights change. Once we controlled those upstream steps, we held about a 0.04 g margin while producing 20,000.
05What would you tell another operator comparing equipment?+
If you're looking to save on labor, FlexPak is the way to go. Look at the price point against the output. We made our money back within the first sales order, and the system allowed those other employees to work on products that also make us money.
"If you're looking to save on labor costs, FlexPak is your way to go. For the price point versus the output, you'll make your money back in a week. For us, it was a no-brainer."

Markie Davis · Operations Manager, Modern Distribution

Interview responses and quotations have been lightly edited for clarity, repetition and length without changing their meaning. Production, staffing, precision, business-growth and payback figures are Modern Distribution's reported historical results and reflect its material, trained team, product mix, margins, equipment configuration and workflow at the time. Individual results will vary.

FlexPak Commercial Solution

FlexPak Max — Built for this kind of output.

See how the FlexPak Max fits your operation. USA-built, no mandatory service contract, lifetime technical support.

See Machine Specs